Project 1.


Project 1 is a building with 43,000 sqm Floor Area x 11.5m high. The Building is Operational between 109/119 hours a week The SIGMA III-4 High Efficiency Radiant Heating System provides comfort for workers at +19oC

Heating In The Storage Areas is maintained at +18oC
The Building is set back 49 to 59 hours a week to +13oC

Doorways are heated by a dedicated door-heating system to prevent cold air ingress as more than 120 Delivery Trucks a day enter & leave the Building creating diesel engine emissions

The BEST ventilation system changed the internal air 2.5/hour

The Old System Gas Consumption was 23.8m kW/hrs/season 

The New High Efficiency SIGMA lll/4 Heating Annual Gas Budget Guarantee Was 2.5m kW/hrs/season

The 2015 Season figures. Gas Consumed = 1.63m kW/hrs/season making the Energy Saving against the Old HV Warm Air System 93.35%

An additional 34.80% saving against the Globe Energy system guarantee.

Saving the Customer Gas & Power Worth £648,889.00p per year.