Project 2.
Project 2 is a system that was installed as building and Process Heating in a wheel and tyre assembly building in a ‘Just-In-Time’ operation.
The building is 11,000 sqm Floor Area x 15m high
The Building Is Operational 90 hours a week
The SIGMA III-4 High Efficiency Radiant Heating System provides comfort for employees at +19oC
The tyres need to be heated to +18oC as a minimum to keep them pliable for fitting, this is done by storing them in the building
Doorways are heated by a dedicated door-heating system to prevent cold air ingress with Delivery Trucks entering & leaving Building collecting finished products and delivering tyres.
The BEST Heating & Ventilation systems maintain clean fresh heated air quality with which 3.5 complete air changes an hour. The New High Efficiency Heating Annual Gas Budget Guarantee
Was 2.5m kW/hrs/season
In Season 2014 the Gas Consumed = 1.88m kW/hrs/season The Energy Saving against the Old System 82.52%
And 24.84% Saving Against The New System Guarantee