Project 3.


Project 3 is a system that was installed to improve the building air quality and comfort in large motor truck manufacturing building which is 45,000 sqm Floor Area x 13m high. The Building Is Operational 120 hours a week

The Old Warm Air System consumed 25.01m kW/hrs Gas a season And Power 4.25m kW/hrs a season

The SIGMA III-4 High Efficiency Radiant Heating System provides comfort for welding and assembly workers at +19oC

Doorways are heated by dedicated door-heating Zones as part of the system.

The BEST Technology Heating & Ventilation systems maintain clean air quality with 3.5 complete air changes an hour.

The New High Efficiency Heating Annual Gas Budget Guarantee GAS - 5.44 m kW/hrs/season
POWER - kW/hrs/season

In Season 2013 the Gas Consumed = 1.95m kW/hrs/season And the Power was 0.12m kW/hrs/season
The Energy Saving against the Old System 92.21%
And 64.16% Saving Against The New System Guarantee