Project 4 is a system that was installed to improve the building heating quality in large complex of aircraft hangars in Illinois USA.
The buildings could not be used in winter due to the previous boiler systems taking many days to recover comfort sufficient to work in after aircraft movements.
Hanger B734 is one of the buildings which is 4,400sqm Floor Area x 17.5m high
The Building is Operational only 40 hours a week set at +19oC
And is set back 128 hours a week at +13oC
Before the system was installed the hangars were not able to be used for service work 4 months of the year as aircraft movements in and out of the hangers made the buildings too cold to work in.
The Old System consumed 15.64m kW/hrs Gas a season
The SIGMA III-4 High Efficiency Radiant Heating System provides comfort for aircraft maintenance fitters with a guaranteed recovery after aircraft movements to +19oC air temperature in 15 minutes.
The New Heating Annual Gas Guarantee 2.5m kW/hrs/season
In Season 2011 the actual Gas Consumed = 1.45m kW/hrs/season The Energy Saving against the Old System 92.69%